Expression of Interest
S.No Head Lines Date
81 Corrigendum No.2 of NIT No. 3 for Providing and Laying Rising/Pressure Mains of 700-900 mm dia. DI Pipes at Various Locations in Kondli WWTP Catchment Area Under YAP-III (Package K4). 29/09/17
82 Bidder Workshop-DWSIIP/01:Distribution Network Improvement in UGR Command Areas C-02 and C-03 Targeting Continuous Pressurized Water Supply and DMA Based NRW Reduction and Providing House Service Con 26/09/17
83 Corrigendum 13 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent standards of BOD ≤10 mg/l, TSS ≤10 mg/l or better under YAP-III 25/09/17
84 Corrigendum No. 2 for EOI of Setting up Sewage Sludge (Bio-solids) Management Facility at 40 MGD STP Rithala Phase-II 21/09/17
85 Corrigendum 1 to NIT 2(17-18) for P/L 1200 mm Dia. DI Rising / Pressure Main from Bharat Nagar WWPS to Common Inlet Chamber at P 18/09/17
86 Corrigendum No.1 of NIT No. 3 for Providing and Laying Rising/Pressure Mains of 700-900 mm dia. DI Pipes at Various Locations i 18/09/17
87 EOI for installation of flow meters for proper water auditing in DJB 11/09/17
88 Corrigendum 12 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent st 07/09/17
89 NIT No. 3 for Providing and Laying Rising/Pressure Mains of 700-900 mm dia. DI Pipes at Various Locations in Kondli WWTP Catchme 31/08/17
90 NIT 2(2017-18) for P/L 1200 mm Dia. DI Rising / Pressure Main from Bharat Nagar WWPS to Common Inlet Chamber at Pitampura under 31/08/17
91 Corrigendum No. 1 for EOI of Setting up Sewage Sludge (Bio-solids) Management Facility at 40 MGD STP Rithala Phase-II 24/08/17
92 Corrigendum o. 1-DWSIIP/01:Distribution Network Improvement in UGR Command Areas C-02 and C-03 Targeting Continuous Pressurized 24/08/17
93 Expression of InterestCorrigendum 11 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent st 16/08/17
94 DWSIIP/01:Distribution Network Improvement in UGR Command Areas C-02 and C-03 Targeting Continuous Pressurized Water Supply and 14/08/17
95 Setting up Sewage Sludge (Bio-solids) Management Facility at 40 MGD STP Rithala Phase-II 25/07/17
96 Corrigendum 10 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent st 21/07/17
97 Expression of Interest Corrigendum of EOI for the work of Operation and maintenance of 45 MGD STP at kondli i/c sludge / Residue Disposal. 12/07/17
98 Corrigendum of EOI for the work of Operation and maintenance of 45 MGD STP at kondli i/c sludge / Residue Disposal. 05/07/17
99 Corrigendum 9 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent sta 04/07/17
100 Corrigendum 11 for Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WT 22/06/17

Pages

  • deg
  • gov
  • Delhi
  • Voters
  • india
  • Page last updated on: 22-07-2019