Expression of Interest
S.No Head Lines Date
81 Corrigendum 1 to NIT1(17-18) for P/L 1200 mm Dia. DI Rising / Pressure Main from Bharat Nagar WWPS to Common Inlet Chamber at P 02/06/17
82 Corrigendum No. 1 of Providing and Laying Rising/Pressure Mains of 700-900 mm dia. DI Pipes at Various Locations in Kondli WWTP 29/05/17
83 Prebid replies to NIT1(17-18) for P/L 1200 mm Dia. DI Rising / Pressure Main from Bharat Nagar WWPS to Common Inlet Chamber at 24/05/17
84 Corrigendum of -Rehabilitation of sewers of sizes varying from 600mm to 1400mm Dia. in Ashok Vihar and Jahangirpuri area by Stan 23/05/17
85 Corrigendum 8 for Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WT 19/05/17
86 Corrigendum 7 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent standards of BOD ≤10 mg/l, TSS ≤10 mg/l or better under YAP-III 16/05/17
87 Expression of InterestCorrigendum 6 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent sta 09/05/17
88 EOI for the work of Operation and maintenance of 45 MGD STP at kondli i/c sludge / Residue Disposal. 02/05/17
89 Corrigendum 5 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent standards of BOD ≤10 mg/l, TSS ≤10 mg/l or better under YAP-III 26/04/17
90 Re-invite-Rehabilitation of sewers of sizes varying from 600mm to 1400mm Dia. in Ashok Vihar and Jahangirpuri area by Standalone 25/04/17
91 Corrigendum 7 for Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WTP 19/04/17
92 EOI for P/L 1200 mm Dia. DI Rising / Pressure Main from Bharat Nagar WWPS to Common Inlet Chamber at Pitampura under JICA assis 19/04/17
93 Providing and Laying Rising/Pressure Mains of 700-900 mm dia. DI Pipes at Various Locations in Kondli WWTP Catchment Area Under 17/04/17
94 Corrigendum 4 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent sta 10/04/17
95 Corrigendum 3 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent st 06/04/17
96 Corrigendum 2 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent sta 06/04/17
97 Expression of InterestPrebid reply for Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WTP 24/03/17
98 Corrigendum for Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WTP including Upgradation and Impl. on of Part Existing Units and CWMC. 24/03/17
99 Prebid reply of EOI for Performance Based contract for leakage Detection and reduction. 21/03/17
100 Revised EOI for Performance Based contract for leakage Detection and reduction. 21/03/17

Pages

  • Digital-india
  • Digitalpayments
  • eoffice
  • e-sla
  • tenders-delhi
  • online-services
  • degs
  • indiangov
  • Page last updated on: 22,Mar 2019