Expression of Interest
S.No Head Lines Date
41 Auction Notice (2018-19) - Open Auction is hereby invited on urgent basis on behalf of the president of India, in the office of the Dy. Director (HORTI) South on 18-05-2018 at 3.00 P.M. 22/06/18
42 EOI Regarding Empanelment of Agencies for providing hired tanker to transportation the treated effluent from various STP DJB. 14/05/18
43 Corri 1 of Construction of 564 MLD (124 MGD) WWTP on DBO (one year DLP plus 10 years O&M) basis at Okhla under YAP-III (Package-O). 04/05/18
44 Re-Invite-Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WTP including Upgradation and Impl. on of Part Existing Units and CWMC. 02/05/18
45 Construction of 564 MLD (124 MGD) WWTP on DBO (one year DLP plus 10 years O&M) basis at Okhla under YAP-III (Package-O). 09/04/18
46 Corrigendum 19 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent standards of BOD ≤10 mg/l, TSS ≤10 mg/l or better under YAP-III 05/03/18
47 CNO.3-NIT-1-Design, Const., Inst., Testing, Comm.. & Auto.. with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WTP including Upgradation and Impl. on of Part Existing Units & CWMC is hereby withdrawn
48 NIT 6-DWSIIP/01:Distribution Network Improvement in UGR Command Areas C-02 and C-03 Targeting Continuous Pressurized Water Supply and DMA Based NRW Reduction and Providing HSC is hereby withdrawn. 15/02/18
49 Corrigendum 18 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent standards of BOD ≤10 mg/l, TSS ≤10 mg/l or better under YAP-III 15/02/18
50 Corrigendum No.2-Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WTP including Upgradation and Impl. on of Part Existing Units and CWMC. 29/01/18
51 Corrigendum 17 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent standards of BOD ≤10 mg/l, TSS ≤10 mg/l or better under YAP-III 16/01/18
52 Re- Invite-Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WTP including Upgradation and Impl. on of Part Existing Units and CWMC. 12/01/18
53 DWSIIP/01:Distribution Network Improvement in UGR Command Areas C-02 and C-03 Targeting Continuous Pressurized Water Supply and DMA Based NRW Reduction and Providing House Service Connections. 12/01/18
54 Corrigendum 16 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent standards of BOD ≤10 mg/l, TSS ≤10 mg/l or better under YAP-III 04/01/18
55 EOI for the work of "Consultancy services for carrying out Hydraulic Modelling of water network on the command area of Maya Puri. 08/12/17
56 Corrigendum 15 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent standards of BOD ≤10 mg/l, TSS ≤10 mg/l or better under YAP-III 08/12/17
57 Corrigendum No. 1 of Expression of Interest for DJB in house IT System. 07/12/17
58 Expression of Intrest for DJB in house IT System. 22/06/18
59 C & A No.3 to NIT 2(17-18) for P/L 1200 mm Dia. DI Rising / Pressure Main from Bharat Nagar WWPS to Common Inlet Chamber at Pitampura under JICA assisted Yamuna Action Plan Phase-III (Package R1b). 10/11/17
60 Corrigendum No.3 of NIT No. 3 for Providing and Laying Rising/Pressure Mains of 700-900 mm dia. DI Pipes at Various Locations in Kondli WWTP Catchment Area Under YAP-III (Package K4). 09/11/17

Pages

  • deg
  • gov
  • Delhi
  • Voters
  • india
  • Page last updated on: 21-05-2019