Expression of Interest
S.No Head Lines Date
21 Re-Invite-Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WTP including Upgradation and Impl. on of Part Existing Units and CWMC. 02/05/18
22 Construction of 564 MLD (124 MGD) WWTP on DBO (one year DLP plus 10 years O&M) basis at Okhla under YAP-III (Package-O). 09/04/18
23 Corrigendum 19 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent standards of BOD ≤10 mg/l, TSS ≤10 mg/l or better under YAP-III 05/03/18
24 CNO.3-NIT-1-Design, Const., Inst., Testing, Comm.. & Auto.. with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WTP including Upgradation and Impl. on of Part Existing Units & CWMC is hereby withdrawn
25 NIT 6-DWSIIP/01:Distribution Network Improvement in UGR Command Areas C-02 and C-03 Targeting Continuous Pressurized Water Supply and DMA Based NRW Reduction and Providing HSC is hereby withdrawn. 15/02/18
26 Corrigendum 18 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent standards of BOD ≤10 mg/l, TSS ≤10 mg/l or better under YAP-III 15/02/18
27 Corrigendum No.2-Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WTP including Upgradation and Impl. on of Part Existing Units and CWMC. 29/01/18
28 Corrigendum 17 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent standards of BOD ≤10 mg/l, TSS ≤10 mg/l or better under YAP-III 16/01/18
29 Re- Invite-Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WTP including Upgradation and Impl. on of Part Existing Units and CWMC. 12/01/18
30 DWSIIP/01:Distribution Network Improvement in UGR Command Areas C-02 and C-03 Targeting Continuous Pressurized Water Supply and DMA Based NRW Reduction and Providing House Service Connections. 12/01/18
31 Corrigendum 16 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent standards of BOD ≤10 mg/l, TSS ≤10 mg/l or better under YAP-III 04/01/18
32 EOI for the work of "Consultancy services for carrying out Hydraulic Modelling of water network on the command area of Maya Puri. 08/12/17
33 Corrigendum 15 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent standards of BOD ≤10 mg/l, TSS ≤10 mg/l or better under YAP-III 08/12/17
34 Corrigendum No. 1 of Expression of Interest for DJB in house IT System. 07/12/17
35 Expression of Intrest for DJB in house IT System. 22/06/18
36 C & A No.3 to NIT 2(17-18) for P/L 1200 mm Dia. DI Rising / Pressure Main from Bharat Nagar WWPS to Common Inlet Chamber at Pitampura under JICA assisted Yamuna Action Plan Phase-III (Package R1b). 10/11/17
37 Corrigendum No.3 of NIT No. 3 for Providing and Laying Rising/Pressure Mains of 700-900 mm dia. DI Pipes at Various Locations in Kondli WWTP Catchment Area Under YAP-III (Package K4). 09/11/17
38 Corrigendum No. 3 for EOI of Setting up Sewage Sludge (Bio-solids) Management Facility at 40 MGD STP Rithala Phase-II 02/11/17
39 Expression of Interest 27/10/17
40 Corri & Adde No. 02 and Bidder's reply-DWSIIP/01:Distribution Network Improv in UGR Command Areas C-02 and C-03 Targeting Continuous Pressurized Water Supply and DMA Based NRW Reduction and Prov. HSC. 03/10/17