1 Corrigendum No.1 of NIT 9- DWSIIP/01:Distribution Network Improvement in UGR Command Areas C-02 and C-03 Targeting Continuous Pressurized Water Supply and DMA Based NRW Reduction and Providing House Service Connections. 07/01/19
2 Improvement of Water Supply System by Const./Rehab./Replacement,Supply,Laying,Inst.,Testing, Comm. of Transmission ---water distribution in the Chandrawal WTP Command Area (Pkg-3 Central Zone) 29/12/18
3 NIT 9- DWSIIP/01:Distribution Network Improvement in UGR Command Areas C-02 and C-03 Targeting Continuous Pressurized Water Supply and DMA Based NRW Reduction and Providing House Service Connections. 28/12/18
4 Reply to Pre-Bid queries received in Pre- Bid meeting held on 27.11.2018 for 3rd Expression of interest (EOI) for empanellment of manufacturers of 15 mm dia water meters. 11/12/18
5 3rd Expression of interest (EOI) for empanellment of manufacturers of 15 mm dia water meters. 06/11/18
6 RFP for Study on Exploration of Fresh Water in Swarka area as well as Brackish Water in Entire Delhi. 04/09/18
7 Corrigendum & Prebid of reply consultancy firm for planning, hydraulic modeling, leak detection works etc. for reduction of NRW by formation of 102 DMA in ph-I in water supply network of DJB 29/08/18
8 EOI for drilling of the tube wells in Rocky and alluvial strata separately. 27/08/18
9 Hiring of consultancy firm for planning, hydraulic modeling, leak detection works etc. for reduction of NRW by formation of 102 DMA in phase-I in water supply network of DJB” and its O&M for 2 years. 30/07/18
10 Corri 5 & Re-Invite-Design, Const., Inst., Testing, Comm. & Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WTP including Upgradation and Impl. on of Part Existing Units and CWMC. 30/07/18
11 C&A 6 of Construction of 564 MLD (124 MGD) WWTP on DBO (one year DLP plus 10 years O&M) basis at Okhla under YAP-III (Package-O). 23/07/18
12 C&A 5 of Construction of 564 MLD (124 MGD) WWTP on DBO (one year DLP plus 10 years O&M) basis at Okhla under YAP-III (Package-O). 18/07/18
13 Corri 4 & Re-Invite-Design, Const., Inst., Testing, Comm. & Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WTP including Upgradation and Impl. on of Part Existing Units and CWMC. 18/07/18
14 Corri 2 of Construction of 564 MLD (124 MGD) WWTP on DBO (one year DLP plus 10 years O&M) basis at Okhla under YAP-III (Package-O). 22/06/18
15 Corri 2 of Re-Invite-Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WTP including Upgradation and Impl. on of Part Existing Units and CWMC. 18/06/18
16 Corri of Re-Invite-Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WTP including Upgradation and Impl. on of Part Existing Units and CWMC. 21/05/18
17 Auction Notice (2018-19) - Open Auction is hereby invited on urgent basis on behalf of the president of India, in the office of the Dy. Director (HORTI) South on 23-05-2018 at 3.00 P.M. 21/05/18
18 Auction Notice (2018-19) - Open Auction is hereby invited on urgent basis on behalf of the president of India, in the office of the Dy. Director (HORTI) South on 18-05-2018 at 3.00 P.M. 22/06/18
19 EOI Regarding Empanelment of Agencies for providing hired tanker to transportation the treated effluent from various STP DJB. 14/05/18
20 Corri 1 of Construction of 564 MLD (124 MGD) WWTP on DBO (one year DLP plus 10 years O&M) basis at Okhla under YAP-III (Package-O). 04/05/18